PLANNING AND CONTROL FOR JOB SHOP PRODUCTION
Job shops perform an array of jobs and each job is different. In job shop production
predictions of demand for products is not possible. In a job shop different jobs are
performed with a prescribed set of operations and the time taken by each operation.
The equipment for job shop productions are divided for use in different departments.
The requirement of each machine is different based on the operation to be performed
for a particular job. The job shop is waiting line system in the respect that when a
job is finished from one machine, it waits in line to enter the next machine because
there are earlier jobs in line too. Vice versa, the machines also wait for jobs while
running idly. So, a proper system of planning and control has to be in place for
optimizing the job shop production.
Aspects of job shop production:
- The proper sequencing and prioritizing is must for such production to avoid confusion and wastage.
- The scheduling should be done based on the estimated time taken by each job.
- The running time of a machine should be calculated while it is performing an operation
The performance of a facility is measured by following standards:
- The average time taken by each job
- The total processing time
- The mean of the number of jobs completed before stipulated time and the jobs completed after the stipulated time
- The mean waiting time of each job
- The average of number of jobs to be done in a unit
The factors affecting a job shop unit are as follows:
- Total number of jobs to be done
- Total number of machines required
- Manufacturing facilities
- Evaluation and assessment of efficiency of men and machines
Job shop productions: case 1
First we will study the case where n number of jobs are performed by a single machine. In such a
case prioritizing and scheduling is very important because the jobs are waiting inline to be completed.
The objective is to improve the average idle time, waiting time, the work in process time. The shortest
processing time (SPT) is aimed for in a job shop production.
Job shop production: case 2
In such a scenario, n number of jobs are performed by two machines M1 and M2. The processing time on both
the machines is calculated. The minimum time to complete a job is also stipulated. Then a sequence is worked
out to line the jobs on both the machines in such a way that the target of maximum production in minimum time
is achieved.
Prioritizing rules for job shops:
The job which has the shortest processing time is selected. Manufacturers may also put the job which has the
earliest delivery due date first in line. First come first serve rule may be applied to cut any slack or
wastage. So it depends on the manufacturer's priorities and the master schedule.
Examples of job shop productions:
They include paint shops, machine tool factories and specialty restaurants. Given below is a brief outline
of the paint manufacturing process, In this, paints are manufactured in a variety of colors and even patterns
and the machines used are the same for all the jobs which are done.
- First a color pigment is selected.
- Then a brightener is added to it to bring out its texture.
- Next, binder and plasticizer is added which will make it stick to the wall.
- Lastly, additives and water is added to improve its consistency
Online Live Tutor Planning and Control for Job Shop Production:
Online Factors Affecting a Job Shop Unit Help:
We have the best tutors in Finance in the industry. Our tutors can break down a
complex Planning and Control for Job Shop Production problem into its sub parts
and explain to you in detail how each step is performed. This approach of breaking
down a problem has been appreciated by majority of our students for learning Planning
and Control for Job Shop Production concepts. You will get one-to-one personalized
attention through our online tutoring which will make learning fun and easy. Our
tutors are highly qualified and hold advanced degrees. Please do send us a request
for Planning and Control for Job Shop Production tutoring and experience the quality
yourself.
Online Factors Affecting a Job Shop Unit Help:
If you are stuck with a Factors Affecting a Job Shop Unit Homework problem and
need help, we have excellent tutors who can provide you with Homework Help. Our
tutors who provide Factors Affecting a Job Shop Unit help are highly qualified.
Our tutors have many years of industry experience and have had years of experience
providing Factors Affecting a Job Shop Unit Homework Help. Please do send us the
Factors Affecting a Job Shop Unit problems on which you need Help and we will
forward then to our tutors for review.
Other topics under Production Planning:
- Capacity Planning
- Control of Production
- Economic Size Industrial Unit
- Facility Layout
- Gantt Chart
- Planning & Control of Batch Production
- Planning & Control of Mass Production
- Planning and Control of Projects
- Procedure of Production Planning & Control
- Project Scheduling
- Purpose of Production, Planning and Control
- Routing, Routing Sheet